04 50 16 77 08
contact@capterrainsimmo.fr

8, Avenue des Allobroges
Thonon les bains

9h 12h – 14h 18h
Du lundi au vendredi 
9h – 12h le samedi

Installation: Access

Installation: Access

The you are installing (e.g., wood, metal, vinyl).

The of the installation (e.g., fence, mailbox, retaining wall). Installation:

: Add approximately 6 inches of gravel to the bottom of the hole for drainage before placing the post. The you are installing (e

: Mark the exact location of corner, gate, and line posts. Line posts are typically spaced based on the length of your rails plus 2 inches. The you are installing (e.g.

The you're working with (e.g., soil, concrete, sloped terrain). Installation – PostMaster Fence

: Place the post in the hole and use a spirit level to ensure it is vertical (plumb) on all sides.

Retour en haut

The you are installing (e.g., wood, metal, vinyl).

The of the installation (e.g., fence, mailbox, retaining wall).

: Add approximately 6 inches of gravel to the bottom of the hole for drainage before placing the post.

: Mark the exact location of corner, gate, and line posts. Line posts are typically spaced based on the length of your rails plus 2 inches.

The you're working with (e.g., soil, concrete, sloped terrain). Installation – PostMaster Fence

: Place the post in the hole and use a spirit level to ensure it is vertical (plumb) on all sides.